Malis phosphate producer Toguna SA plans to boost phosphate rock capacity tenfold by the end of 2012 at its Tamaguilelt deposit located in the Tilemsi Valley in the north-east of the country, the company told IM.
We are planning to increase our production to 200,000 tpa by the end of 2012, Abdoulaye Djiguiba, the groups technical director, explained.
Toguna, which has a 20,000 tpa capacity, is investing 15m. ($21.7m.) to upgrade the existing plant and build a crusher in order to expand the volumes and...